Swickers Bacon Factory Corrosion Control

EXECUTIVE SUMMARY

At the Swickers Bacon Factory, we were engaged by SunPork Group to tackle significant corrosion issues within the lairage shed. Several beams had deteriorated extensively, requiring urgent attention.


Our team carried out detailed surface preparation followed by the application of a specialised protective coating system designed to halt further corrosion and extend the structure’s service life.


With just a four-day shutdown window, the project required tight coordination, precise execution, and strict adherence to safety and quality standards. The result: a successful outcome delivered on time, with zero disruption to operations — a strong example of our capability in high-pressure industrial environments.

CLIENT SUNPORK GROUP
SERVICE CORROSION CONTROL
LOCATION KINGAROY, QLD
TURNAROUND TIME 4 DAYS